Payments warrants are divided into five sections:

  • Study of architectural engineering plans.
  • Examination of architectural requirements and firefighting and alarm systems after their installation (to be fulfilled once only).
  • Accreditation of companies (to be collected for one time only).
  • Renewal of company accreditation.
  • Material approval.
  • Stages of fulfilling a service allowance for each warrant with the required attachments from the auditors of the accounting department:

 

    - Study of architectural engineering plans (cash):

 

  • After the plans are studied by the engineers, the warrant is filled out, indicating the amount of space in square meters, as no fees are collected for studying residential plans whose area is less than 600 square meters.
  • The auditor signs the warrant by the assistants after the engineers sign it.
  • The auditor shall make a photocopy of the warrant in the designated place “Inquiries” and a stamp from the Bureau on the copy and the original, then attach the union receipt or a letter proving the space with the  
  • The service fee is paid and a receipt is issued to the auditor with the amount paid to follow up on the progress of his transaction.
  • Studying the architectural engineering plans (ie your bills):

 

  • After the plans are studied electronically by the engineers, the warrant is filled out showing the amount of space in square meters, as no fees are collected for studying residential plans whose area is less than 600 square meters.
  • The transaction is transferred by the head of the engineering department to the accounting branch.
  • The warrant is checked by the accountant and given an electronic payment number.
  • A text message is sent to the concerned person with the electronic defense number and the amount.
  • When the payment is made electronically, the accountant transfers it to the Amman Municipality (civil defense approval).

Examination of firefighting and alarm systems after installation:

 

  • After the detection is done by the detection officer, the warrant is filled out, indicating the amount of area in square meters.
  • The auditor signs the warrant by the heads of the people after the detection officer signs it.

Accreditation and renewal of accreditation of companies and institutions and approval of materials:

 

   - The same stages in the study, with the attachment of a letter of the study disclosure report signed by the members of the committee.